45,325 SQ FT
OF CONTEMPORARY
WORKSPACE OVER TWO
FLOORS
IN FITZROVIA

Available Space

POTENTIAL SELF-CONTAINED ENTRANCE 1,070 SQ FT

Level 4 - LET

Square
Syft

Level 3 - LET

British Olympic Association
Camelot

Level 2 - AVAILABLE

22,826 SQ FT
2,120 SQ M

Level 1 - AVAILABLE

22,499 SQ FT
2,090 SQ M

TOTAL

45,325 SQ FT
4,210 SQ M

Level 1

22,499 SQ FT* | 2,090 SQ M

Level 2

22,826 SQ FT* | 2,120 SQ M

Floorplan | Spaceplan | Combined

Workplace Wellness

  • WIRED SCORE GOLD

    Resilient, diverse and secure digital infrastructure

  • WORKSPACE

    Large and efficient floors of 23,000 sq ft Designed to 1 person per 8 sq m Exposed columns and services

  • ARRIVAL

    Statement entrance on New Cavendish Street

  • DRIVE IN

    Secure basement car Electric vehicle charging points parking accessed via a ramp from street level

  • VERTICAL CONNECTIVITY

    Three 17-person scenic lifts Dedicated basement lift from ground floor

  • VOLUME AND LIGHT

    Island site with light on all four elevations floor to ceiling heights of up to 2.7m

Workplace Wellness

  • ANTI-MICROBIAL TOUCH POINTS

    Key touch points within the building are formed of anti-microbial compounds

  • VERTICAL MOVEMENT

    Feature stair between the basement, ground and 1st/2nd floor offices, providing an active alternative to lifts

  • COFFEE

    Barista In Reception

  • ULTRAVIOLET AIR FILTRATION

    On-floor fan coil units fitted with germicidal ultraviolet lamps

  • RIDE IN

    Ramp down from street level 91 secure bicycle spaces

  • SHOWERS AND CHANGING

    10 showers Drying room and towel facility 91 lockers

Exceptional Finishes

A high-quality, contemporary material palette has been selected comprising Terrazzo, ceramics, timber and bronze finishes.

The finishes of key touch points are formed of anti-microbial compounds to help limit the spread of potentially harmful microbes within the workplace.

Close More Info